As part of the Ferst Drive realignment, access, safety, and connectivity project, a raised crosswalk will be constructed on Ferst Drive. This construction requires both lanes of Ferst Drive between Fowler Street and State Street to be closed from March 18 - 22.
As part of the Ferst Drive realignment, access, safety, and connectivity project, a raised crosswalk will be constructed on Ferst Drive. This construction requires both lanes of Ferst Drive between Fowler Street and State Street to be closed from March 18 - 22.
A vehicular detour plan is in effect, indicating no through traffic on Ferst Drive between Fowler Street to State Street. Access will be available to Plum Street (Klaus Service area), the Klaus parking deck, Cherry Street, and the baseball maintenance area.
A digital sign will be placed at State Street indicating access points beyond road closure signs.
We appreciate your patience while we make these campus improvements.