The required repair and improvements to the chilled water distribution system will take several months.
Aug 19, 2024
With the resolution of the chilled water outage, the system is stable and all campus buildings are receiving cool air. The repairs and system improvements needed in Harrison Square, the location of the initial disruption, will require construction fencing and detours around the area for several months.
Wayfinding maps with detailed pedestrian and ADA detour information will be posted at locations surrounding the site.
The map below indicates the suggested routes to safely navigate the area.
Thank you for your patience and flexibility as we work to improve our campus infrastructure.