The eastbound lane of Ferst Drive in front of the Weber Building will be closed during the work day 12/14 - 12/18.
Dec 07, 2020 - Atlanta, GA
Excavation will occur on Ferst Drive in front of the Weber Building to confirm the location, depth, and size of the city of Atlanta watermain to aid in the design of a new sprinkler system for the Weber Building.
The eastbound lane of Ferst Drive will be closed during the day with two-way traffic maintained in the westbound lane by traffic control. Road plates will cover the excavation site and both lanes will be open at the end of the work day. Bus stops will not be affected but there may be slight delays in the bus routes.