GTRI Building Sign
GTRI Building Sign

GTRI wall reconstruction & sidewalk replacement at State Street to occur May 28th - July 31st State Street

What: Replacement of failing stone wall with granite veneer, poured concrete wall & replacement of concrete sidewalk with GT standard brick paver/concrete sidewalk and new concrete apron into gravel GTRI lot    

                                                                                                                                      

Construction Start Date:  Tuesday, May 28, 2019

                                                                                                                                      

Tentative Construction Completion Date:  Wednesday, July 31, 2019

                                                                                                                                  

Impact:    

·        Campus in-bound lane on State Street & sidewalk will be closed and fenced to provide equipment work area - entrance to gravel lot will remain open. (May 28th to July 31st)

·        Traffic control devices will be placed to maintain continuous in-bound and out-bound traffic on State Street throughout project duration. (May 28th to July 31st)

·        Select parking spaces in paved lot North of Baker will be required to be blocked during stair demolition. (Timeframe – TBA)

·        Entrance into GTRI gravel lot will be blocked for installation of new concrete apron.  Lot is still accessible from paved lot North of Baker during this time.  (Timeframe – TBA)

These dates are subject to change depending on weather.  

 

Please do not hesitate to let me know if you have any questions and/or concerns.